E 222nd Street Rehabilitation

Special Notes for Residents

 If the weather allows paving will take place on 4/19 on the west side of E222 from the Marginal to Crystal Avenue. This will only allow for Southbound traffic during the paving. Please watch for signs and traffic officers.

Location

E 222nd Street from Babbitt Road to north Lakeland Boulevard

Description

This project will include the following items. Point repair of the collection system. Replacement of the water line from Tracy Avenue to Babbitt Road. Full depth repair of the road base in multiple areas. Replacement of curbs and driveway aprons. Partial replacement of sidewalks where needed. ADA ramps installed at intersections. Repaved road surface and brick pavers in business district. Bio-cell tree pits in the Municipal district. Detours are posted. Weekly updates are posted at http://www.cityofeuclid.com/news/1252

Purpose

Replacement of the waterline from Tracy Avenue to Babbitt was needed due to deterioration. Dual waterlines will be installed from South Lakeshore going north to Babbitt Road. Point repair of storm and sanitary sewers was found to be needed in areas. Full width repaving will take place.

Inspector

Mark Swogger, GPD Group 

Anticipated Completion Date

July 31, 2019

Project Contractor

Fabrizi Trucking and Paving Inc.