E 219th & E 221st Streets I & I reduction

Special Notes for Residents

Paving is scheduled for Saturday July 22nd (weather permitting). Please use caution as during work hours as machinery and workers will be in the roadway

Location

E 219th and E 221st Street off Euclid Avenue

Description

Repair and restoration of the existing collection system. Separation of storm and sanitary manholes to help prevent infiltration. Replacement of water line on E 221st Street

Purpose

Reduction of inflow and infiltration to the collection system through bad joints and failing manholes. Replacement of water line on E 221st Street as part of Cleveland Water's line replacement program

Inspector

Jon Thomas

Anticipated Completion Date

 Late September 2017

Project Contractor

Terrace Construction