Brandywine SSO Elimination Project

Location

Off Brandywine Drive between Balmoral Drive and Helmsdale Drive

Description

Installation of an overflow tank at the existing pump station

Purpose

This SSO elimination is part of the City of Euclid's Federal EPA Consent Decree. The purpose of this project is to eliminate sanitary sewer overflows during periods of high flow. An overflow tank is being constructed which will capture the overflows and hold them until flows return to a normal level and the tank can be pumped to the treatment plant. This project is in Richmond Heights as well as Euclid. Richmond Heights City Engineer and Mayor have worked with the contractor and design Engineer on this project.

Inspector

Jon Thomas

Anticipated Completion Date

Project is completed

Project Contractor

Nerone and Sons